Replacing an old worktop with a modern artificial stone worktop in Kladno

The customer asked us for a radical and almost complete rework of the existing kitchen. The goal was to change the original impractical U-shaped layout into a modern straight line supplemented by a separate kitchen island.

We respond within 24 hours on business days.

  • The entire team on site

    Electricians, plumbers, and installers—no need to look for other tradespeople.

  • Fixed price in writing

    Final price agreed before we start. No surprises on the invoice.

  • Within a week

    Not in three months. We’ll work around your schedule.

300+completed kitchens throughout the Czech Republic
Foto Replacing an old worktop with a modern artificial stone worktop in Kladno

Worktop installation

Kladno

05/2024

Description:

Complications and technical challenges:

  • Hood installation in difficult conditions: One of the most complex tasks was installing the extractor hood into an upper cabinet that had not been structurally designed for it by the manufacturer. The customer also required the installation to be done without dismantling the surrounding kitchen and without removing the upper cabinets from the wall. Even in these extremely limited and tight conditions, we successfully handled this technical challenge.
  • Layout change: The original kitchen had to be carefully dismantled and the modules moved exactly according to the new technical brief so that a new, fully functional set could be created.

Worktop processing and installation:
After successfully rearranging the cabinets into the new formation, we proceeded with processing and installing the worktops for the main line and the new island.

  • Focus on safety and detail: To ensure maximum safety in use and eliminate sharp edges after formatting, we precisely milled the edges along the full length of both worktops with a 3.7 mm radius. For a perfect aesthetic and functional result, we also milled and rounded all worktop corners to a 35 mm radius.

Result: The transformation of the space was truly remarkable. The customer and all relatives who saw the result of our work were absolutely delighted with the new look. The old kitchen gained such a fresh and modern appearance that it looked as if we had installed a brand-new premium kitchen the customer had been dreaming of for the last 10 years.

What you get with us — and what you risk without us

Most installation companies only handle the cabinets. We handle the entire kitchen unit—including everything behind it in the wall.

Why Choose Us

There was a lot of work and everything was finished in 4 days. The worktop was processed directly on site, and it is clear that this gentleman is a professional in his field. The result is simply amazing.

Real apartments. Real installations. No renderings.

Our Work